Excavator cutting edge construction machinery parts

The cutting edge part are the stress points that first contact the working surface when digging and are easy to wear

  • Item NO.:

    Excavator or bulldozer cutting edge aftermarket spare parts
  • Payment:

    T/T.30% in deposit ,balance on the receipt fo copy of B/L
  • Product Origin:

    China
  • Color:

    Customer Required
  • Shipping Port:

    Xiamen
  • Lead Time:

    Within 15-20 days after contract established
  • Order(MOQ):

    2
  • Product weight:

    1-10KG

Bucket bush short description:

The cutting edge part are the stress points that first contact the working surface when digging and are easy to wear, so the side edge should be added. If the bucket is excessively worn, it cannot be repaired, but the side edge can be replaced. 

Product information

NOTES:Please contact us for the details!!!



Our Factory Show 

Factory show
Factory show
Factory show
Factory show

Product shipping


Product packing


Related Products
154-70-11314
Cutting material:High-Carbon Steel/Boron Steel(30MnB)
144-871-5130
Cutting material:High-Carbon Steel/Boron Steel(30MnB)
202-70-63161
The cutting edge part are the stress points that first contact the working surface when digging and are easy to wear
205-70-74180
The cutting edge part are the stress points that first contact the working surface when digging and are easy to wear
112-2487
Excavator blade is designed to move more material in less time than a conventional bucket
2014504
Excavator blade is designed to move more material in less time than a conventional bucket
2015429
Excavator blade is designed to move more material in less time than a conventional bucket
Subscribe to our newsletter
Subscribe to our newsletter

Sign up to our newsletter for the construction machinery

Leave A Message

Leave A Message
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.

Home

Product

skype

whatsapp